A good BOM lists one line per manufacturer part number with reference designators, quantity per board, manufacturer, manufacturer part number, description and package, plus approved alternates and clear do-not-place markings. It must come from the same revision as your Gerbers and pick-and-place file. A complete, consistent BOM is the single biggest factor in a fast, accurate quote.
The columns to include
| Column | Example | Why it matters |
|---|---|---|
| Line / item | 1 | Easy reference in emails and questions |
| Reference designators | C1, C4, C7 | Ties each part to its place on the board |
| Quantity per board | 3 | Must equal the number of designators |
| Manufacturer | Murata | Identifies the exact part |
| Manufacturer part number (MPN) | The full orderable number | The most important column for sourcing |
| Description / value | Capacitor, 10 µF, 25 V, X7R | Lets a person check the part makes sense |
| Package / footprint | 0805 | Must match the footprint on the board |
| Approved alternates | Second MPN(s) | Avoids delays when a part is short |
| DNP (do not place) | Yes / blank | Prevents populating parts meant to stay empty |
| Notes | Polarized; program before assembly | Special handling or instructions |
Rules that prevent problems
- One line per manufacturer part number, not one line per designator
- Use full, orderable manufacturer part numbers — not distributor numbers or generic values alone
- Make sure quantity equals the count of reference designators on every line
- Mark do-not-place parts clearly and keep them on the BOM
- List approved alternates you’ve actually checked for form, fit and function
- Include mechanical items that are installed during assembly: standoffs, heatsinks, connectors, labels
- Put the board revision and BOM revision in the file name and inside the file
Common mistakes
- “10k resistor” with no package, tolerance or MPN
- Designators on the BOM that don’t exist on the board — or the reverse
- A BOM exported from an older revision than the Gerbers
- Obsolete or not-recommended-for-new-design parts left in a new design
- Mixing units or abbreviations inconsistently (10uF, 10 µF, 10MF)
Check availability before you release
Before sending a design to production, check that key parts are actively produced and available. A part that is end-of-life or on long lead time is far easier to replace in the layout than after boards are built. Our component obsolescence guide covers how to plan for it.
At JLS
In a turnkey order, JLS sources every line of your BOM through a managed, traceable supply chain. An engineer reviews each BOM during quoting, and hard-to-find or long-lead parts are flagged before the build is scheduled. Incomplete BOMs are fine to start with — describe what you have and we’ll work from there.
Ready to send your project?
Send your files or describe your project. An engineer reviews every request, and most quotes go out within 48 hours.