Electronic Manufacturing Services · Dorval, Québec · Established 1993
Home/Box build checklist
Guide

Box Build Assembly Checklist

What to provide for a box build (systems integration) quote and build: complete BOM, assembly drawings, harness drawings, firmware, labels, test procedure and packaging.

Quick answer

For a box build, your manufacturer needs everything that turns boards into a finished product: a complete multi-level BOM including mechanical parts, assembly drawings or exploded views, wire harness drawings, firmware and programming instructions, labelling, a functional test procedure, and packaging requirements. The more complete the package, the more accurate the quote and the smoother the first build.

The package

ItemWhy it matters
Multi-level BOMEvery board, cable, enclosure part, fastener and label, organized by sub-assembly
Board filesGerbers, BOM and pick-and-place for each circuit board
Harness drawingsPinouts, wire specs and lengths for every cable
Assembly drawingsExploded views, assembly order and any special steps
FirmwareFiles, version and programming method
Labels and markingsSerial numbers, regulatory and product labels
Test procedureHow to confirm each unit works before it ships
PackagingHow units should be packed and shipped

Tips for a smooth first build

  • Start with a pilot quantity to validate the assembly steps
  • Provide a sample unit or photos if possible
  • Agree on the test procedure before production
  • Keep all documents under one revision

At JLS

JLS builds the circuit boards, cables and wire harnesses, sources enclosures and mechanical parts (or designs a custom 3D enclosure), and completes the box build into a finished, tested product — from prototype to production.

Ready to send your project?

Send your files or describe your project. An engineer reviews every request, and most quotes go out within 48 hours.

Get a quote →
FAQ

Frequently asked questions

What is box build assembly?

The final stage of electronics manufacturing, where boards, cables and mechanical parts are installed into an enclosure to make a finished product.

What documents does a box build need?

A multi-level BOM, board files, harness drawings, assembly drawings, firmware, labelling details, a test procedure and packaging requirements.

Should I start with a pilot run?

Yes. A small first batch validates the assembly steps and test procedure before production.

Does JLS do box build?

Yes. We build the boards and cables and complete the box build into finished, tested products.

Related services & industries