For a box build, your manufacturer needs everything that turns boards into a finished product: a complete multi-level BOM including mechanical parts, assembly drawings or exploded views, wire harness drawings, firmware and programming instructions, labelling, a functional test procedure, and packaging requirements. The more complete the package, the more accurate the quote and the smoother the first build.
The package
| Item | Why it matters |
|---|---|
| Multi-level BOM | Every board, cable, enclosure part, fastener and label, organized by sub-assembly |
| Board files | Gerbers, BOM and pick-and-place for each circuit board |
| Harness drawings | Pinouts, wire specs and lengths for every cable |
| Assembly drawings | Exploded views, assembly order and any special steps |
| Firmware | Files, version and programming method |
| Labels and markings | Serial numbers, regulatory and product labels |
| Test procedure | How to confirm each unit works before it ships |
| Packaging | How units should be packed and shipped |
Tips for a smooth first build
- Start with a pilot quantity to validate the assembly steps
- Provide a sample unit or photos if possible
- Agree on the test procedure before production
- Keep all documents under one revision
At JLS
JLS builds the circuit boards, cables and wire harnesses, sources enclosures and mechanical parts (or designs a custom 3D enclosure), and completes the box build into a finished, tested product — from prototype to production.
Ready to send your project?
Send your files or describe your project. An engineer reviews every request, and most quotes go out within 48 hours.